Client: Aiken ECI

List of Completed Projects:
Project/Contact Tasks Project Management

North 115/12 kV Substation
(2008-2009)

Terry Walker
(803) 502-2674

Engineered modification by retiring existing 69/12 kV station with new 115/12 kV transformer, circuit switcher and six feeder bays with reclosers.

Physical, Relay and Control Design, RUS spec and contract. Secured material through construction contractor. Secured Control House through packagers, managed construction, and commissioned the station and closed all the RUS documents.

Sage Mill 115/12 kV Substation
(2007-2008)

Terry Walker
(803) 502-2674

Engineered new 115/12 kV station with transformer, circuit switcher and six feeder bays with reclosers.

Physical, Relay and Control Design, RUS spec and contract. Secured material through construction contractor. Secured Control House through packagers, managed construction, and commissioned the station and closed all the RUS documents.

Bealieu 115/12 kV Substation
(2007-2008)

Terry Walker
(803) 502-2674

Engineered modification of adding two 115/12 kV transformers, circuit switchers and four feeder breakers in an existing 115/12 kV station.

Physical, Relay and Control Design, RUS spec and contract. Secured material through construction contractor. Secured Control House through packagers, managed construction, and commissioned the station and closed all the RUS documents.

Eureka 115/12 kV Substation
(2006-2007)

Terry Walker
(803) 502-2674

Engineered new 115/12 kV station with transformer, circuit switcher, and six feeder bays with reclosers.

Physical, Relay and Control Design, RUS spec and contract. Secured material through construction contractor. Secured Control House through packagers, managed construction, and commissioned the station and closed all the RUS documents.

Windsor 115/25 kV Substation
(2006-2007)

Terry Walker
(803) 502-2674

Engineered modification by retiring existing 115/12 kV station with new 115/25 kV transformer, circuit switcher and six feeder bays with reclosers.

Physical, Relay and Control Design, RUS spec and contract. Secured material through construction contractor. Secured Control House through packagers, managed construction, and commissioned the station and closed all the RUS documents.